Software Glitch Doomed Firefly Aerospace’s Rocket Mission, Investigation Reveals

Credit: Firefly Aerospace

disclosed on February 20th that a critical malfunction sabotaged the upper stage of its during a December launch, thwarting a planned second burn and stranding its payload in a low orbit.

According to a statement issued by Firefly, an anomaly in the guidance, navigation, and control (GNC) software hindered the upper stage from executing the intended circularization burn during the company’s “Fly the Lightning” mission on December 22nd. Consequently, the upper stage, along with its cargo—a technology demonstration —remained trapped in an orbit with a low perigee.

Read More

An extensive investigation, led by Firefly’s internal mishap team and complemented by an independent review, traced the glitch to an error in the GNC software algorithm. This flaw prevented the system from transmitting vital pulse commands to the Reaction Control System (RCS) thrusters prior to the stage two engine relight. Although Firefly did not delve into specifics, it is presumed that the RCS thrusters would have facilitated proper stage orientation and stabilized propellant flow to the engine.

“We’re proud of the combined team’s ability to work together to achieve this positive outcome,” remarked Bill Weber, Firefly’s chief executive, expressing optimism regarding the investigation’s findings. “Looking ahead, the important long-term outcome is the rapid, thorough maturation of as the dependable one-metric-ton-class rocket the market is demanding.”

Firefly affirmed its commitment to rectifying the GNC software error while instituting procedural enhancements to enhance fault detection in future missions. Although the company refrained from specifying a precise timeline, it assured stakeholders that the Alpha rocket would be primed for its next launch in the “coming months.”

The mishap not only jeopardized Firefly’s mission objectives but also imposed challenges on Lockheed Martin, whose satellite was ensnared in a perilously low orbit with an initial perigee of approximately 215 kilometers. Despite the setback, Lockheed expedited the satellite’s antenna technology tests within a “dramatically compressed mission timeline,” achieving substantial milestones within weeks. The satellite met its fiery demise on February 10th, as reported by The Aerospace Corporation.

While Firefly has yet to announce a definitive return-to-flight schedule for the Alpha rocket, Brett Alexander, the company’s chief revenue officer, reiterated earlier projections of performing four Alpha launches this year. Addressing concerns at the SpaceCom conference on February 1st, Alexander emphasized Firefly’s unwavering commitment to its launch manifest, undeterred by the recent setback.

Related posts

Leave a Reply

Your email address will not be published. Required fields are marked *